The Public Works Department maintains the M.D.'s road and ditch network. The Municipality has its own equipment, but may contract out large jobs such as major road re-building or large culvert replacements. 
This is some roadwork done by our staff in the summer of 2008. Below is the completed section of road.

Approaches - Anyone wishing to have an approach installed onto their property must file a request at the M.D. office. This request must be approved by Council, with the Public Works Foreman determining if a culvert is required, and if so, what size should be used. The M.D.'s policy is that one approach be supplied at M.D. cost per quarter section. The standard size is 12 metres (40 feet). If there is already an existing approach, the landowner must pay for any additional approaches requested.
Backsloping - The M.D. will accommodate requests for backsloping of road ditches at no charge to the landowner, provided the landowner provides any additonal land required at no charge to the Municipality. Any fences present must be removed by the landowner prior to work commencing.
Snowplowing/Grading of Driveways - In order to have your driveway snowplowed or graded by municipal equipment, the resident must sign a Snowplow Agreement with the M.D. and must purchase a snowplow flag, which provides one plowing. At the present time, snowplow flags may be purchased at the M.D. office for a cost of $25.00 plus GST. When plowing is required, the flag should be placed at the end of the driveway and the grader operator will pick it up as he's grading the municipal road. A Snowplow Agreement is attached below for your convenience.
Gravel - The M.D. of Peace owns 3 gravel pits, but residents wishing to haul their own gravel may only purchase gravel from the M.D. if our loader is at a pit and municipal staff does the loading. Once per year, usually at the beginning of July, the M.D. hires a contractor to gravel municipal roads. Residents may request that the M.D. also gravel their driveways at this time - the resident will pay the contractor's rate for hauling as well as the gravel price. Currently, crushed gravel and reject gravel cost $10.00/cubic yard and pit run gravel costs $5.00/cubic yard. These prices include the loading charge.
Dust Control - The Municipality each year will arrange for dust control to be applied on municipal roads in front of residences, at the resident's cost. Please contact the Municipal Office prior to April 30th if you wish dust control that season and an agreement will be forwarded for your signature. In 2009 the average cost was $509. per 100 metres of control.